Software Development Process (2027): Steps, Models, Timelines and Costs

Nitesh Jain· Founder & Managing Director @ Appic Softwares
Software Development Process (2027): Steps, Models, Timelines and Costs

The software development process is the sequence of phases a team follows to turn an idea into working, maintained software: discovery, requirements, design, development, testing, deployment and maintenance. In 2027 most teams run these phases in short Agile iterations instead of once in strict order, and a typical custom build takes 2 to 18 months.

Who this guide is for: founders, product owners and CTOs in the US, UK, EU and Australia who are planning a custom software build and want to know what happens at each stage, how long it takes, what it costs and what to approve before work moves on.

The software development process is also called the software development life cycle (SDLC). Both terms describe the same set of phases; "SDLC" is more common in enterprise and compliance writing, while "software development process" is more common when founders ask how to build software. If you already have a scope and want a team, talk to our software development company about a fixed discovery phase first.

Key takeaways

  1. Custom software projects reviewed on Clutch average $132,480 and take about 13 months, according to Clutch (2026).
  2. Published MVP costs range from $40,000 to $120,000 (Keyhole Software, 2026) or $50,000 to $100,000 (Clockwise Software, 2025), so ask every vendor for hours per phase rather than a single price.
  3. 84% of developers use or plan to use AI tools, but 46% distrust their accuracy, according to the Stack Overflow Developer Survey (2025).
  4. Large IT projects over $15 million run 45% over budget and deliver 56% less value than predicted on average, according to McKinsey and the University of Oxford (2012).
  5. NIST published a draft SSDF version 1.2 (SP 800-218 Rev. 1) on 17 December 2025, so secure development practices belong in every phase, not only in testing (NIST, 2025).

What is the software development process?

The software development process is a repeatable set of activities that takes software from an idea to a product people use and a team can maintain. The international standard for it is ISO/IEC/IEEE 12207:2017, which defines the life cycle processes for acquiring, building, operating and retiring software.

In practice, the process answers four questions in order: what problem are we solving, what exactly will we build, how will we build and test it, and how will we run and improve it after launch. Each phase produces a deliverable that the next phase depends on, which is why skipping discovery or testing usually costs more later.

Takeaway: Treat the software development process as a chain of decisions with a deliverable at each link, not as a single build step.

What are the 7 phases of the software development process?

The 7 phases of the software development process are discovery, requirements, design, development, testing, deployment and maintenance. The table shows what each phase produces, who leads it, what the buyer should approve and how long it typically takes for an MVP.

PhaseMain deliverableLed byWhat the buyer approvesTypical MVP duration
1. DiscoveryProblem statement, users, success metrics, rough budgetProduct owner, business analystScope boundary and success metrics1 to 3 weeks
2. RequirementsUser stories, acceptance criteria, non-functional requirementsBusiness analyst, product ownerPrioritised backlog and must-have list1 to 2 weeks
3. DesignArchitecture, data model, UX flows, clickable prototypeSoftware architect, UX designerPrototype and architecture decision record2 to 4 weeks
4. DevelopmentWorking increments in sprintsDevelopers, tech leadSprint demos against acceptance criteria6 to 12 weeks
5. TestingTest reports, fixed defects, security scan resultsQA engineersRelease readiness checklist2 to 4 weeks, overlapping development
6. DeploymentProduction release, monitoring, rollback planDevOps engineerGo-live decision1 to 2 weeks
7. MaintenanceBug fixes, updates, new featuresSupport and product teamSupport level and yearly roadmapOngoing

The MVP durations are Appic estimates for a small product and line up with the 2 to 4 month MVP range that Keyhole Software (2026) reports from more than 200 projects. Testing takes a large share of effort: ScienceSoft (2026) puts it at about 30% of project time.

  1. Discovery: confirm the problem, the users and the business case before anyone writes code.
  2. Requirements: turn goals into user stories with acceptance criteria, plus performance, security and compliance needs.
  3. Design: choose the architecture and tech stack, and test the user flows with a clickable prototype.
  4. Development: build in short iterations, with a demo at the end of each one.
  5. Testing: run functional, performance and security tests, automated where possible.
  6. Deployment: release through a CI/CD pipeline with monitoring and a rollback plan.
  7. Maintenance: fix issues, update dependencies and add features based on usage data.

For the architecture decisions in phase 3, see what a software architect does on a project, and for stack choices see our guide to web tech stacks.

Takeaway: Ask for a named deliverable and a sign-off at the end of each phase, so problems surface in weeks rather than months.

Which software development model should you use?

Agile with Scrum or Kanban suits most new products, Waterfall suits fixed, well-understood scopes, and DevOps practices suit any product that will be released often. The models differ in how often the phases repeat and when the buyer sees working software.

ModelHow the phases runBest forMain risk
WaterfallEach phase once, in order, with a sign-off between phasesFixed-scope, regulated or contract-driven workLate feedback; changes are expensive
V-modelWaterfall with a matching test phase for each design phaseSafety-critical and compliance-heavy systemsSame rigidity as Waterfall
Agile (Scrum)All phases repeat inside sprints of one month or less (Scrum Guide 2020)New products where requirements will changeScope creep without a strong product owner
Agile (Kanban)Continuous flow with limits on work in progressMaintenance, support and steady feature workWeak planning horizon for large releases
SpiralRepeated cycles with a risk analysis in eachLarge, high-risk programmesHeavy process overhead for small teams
DevOpsDevelopment and operations share automated build, test and releaseProducts released weekly or dailyNeeds investment in automation and monitoring

The Agile Manifesto (2001) set out four values, including working software over comprehensive documentation, and the Scrum Guide (2020) limits a sprint to one month or less with three accountabilities: Product Owner, Scrum Master and Developers. Many teams combine models, for example a Waterfall-style discovery and contract followed by Scrum delivery and DevOps release practices.

Takeaway: Choose Scrum for a new product, Kanban for ongoing improvement, and keep Waterfall for scopes that truly cannot change.

How long does the software development process take?

The software development process takes about 2 to 4 months for an MVP, 4 to 8 months for a medium product and 8 to 18 months or more for a complex system, according to Keyhole Software (2026). Other publishers give similar but not identical ranges, as the table shows.

Publisher (year)MVP or simple buildMedium productComplex or enterprise build
Keyhole Software (2026)2 to 4 months4 to 8 months8 to 18 months or more
Clockwise Software (2025)About 3 to 4 monthsNot statedNot stated
ScienceSoft (2026)2 to 6 months for an MVP-first releaseNot statedNot stated
Clutch (2026)Average project about 13 months across all sizes

Timelines stretch most when requirements change late, when third-party integrations are slow to approve access, and when testing is squeezed at the end. Our 90-day MVP plan for startups shows how to keep a first release inside one quarter.

Takeaway: Plan 2 to 4 months for a focused MVP, and add buffer for integrations and testing rather than for coding.

What does the software development process cost?

Custom software development costs from about $40,000 for a simple MVP to $1 million or more for a complex system, and the Clutch average across reviewed projects is $132,480. Agencies disagree on the starting point because they assume different team locations and scopes. For a full breakdown by project type and region, see our software development cost guide.

Publisher (year)MVP or simple buildMedium productComplex or enterprise build
Keyhole Software (2026)$40,000 to $120,000$120,000 to $300,000$300,000 to $1 million or more
Clockwise Software (2025)$50,000 to $100,000$100,000 to $300,000$500,000 or more
ScienceSoft (2026)From $100,000Not splitUp to $1.5 million
Clutch (2026)Average project $132,480

Team location changes the price more than any other factor. Senior developers in Latin America charge about $60 to $75 per hour, in Europe about $64 to $76 and in Asia about $31 to $41, according to Accelerance's 2026 rates guide. For in-house hiring, the US Bureau of Labor Statistics reports a median software developer salary of $135,980 (May 2025), before benefits and overheads. Appic's blended rates start at $25 per hour.

For deeper breakdowns, see our MVP development cost guide, the app development cost guide and our comparison of offshore software development in India vs Eastern Europe.

Takeaway: Compare quotes by hours per phase multiplied by a blended rate, because headline prices from different agencies are not built on the same assumptions.

How is AI changing the software development process in 2027?

AI is now part of every phase of the software development process, from writing requirements to generating tests, but the evidence on speed and quality is mixed. Teams that gain the most pair AI tools with strong testing and review.

  1. Adoption is near universal: 90% of respondents to the 2025 DORA report use AI at work, and Gartner expects 90% of enterprise software engineers to use AI code assistants by 2028, up from under 14% in early 2024 (Gartner, 2025).
  2. Speed gains are task-dependent: in GitHub's controlled study, developers with Copilot finished a coding task 55% faster (GitHub, 2022), while METR found experienced open-source developers took 19% longer with early-2025 AI tools (METR, 2025). METR's February 2026 update estimated an 18% speed-up with newer tools, for a subset of returning developers, with a confidence interval from 38% faster to 9% slower (METR, 2026).
  3. Stability needs guarding: the 2024 DORA report found that as AI adoption increased, delivery throughput fell by an estimated 1.5% and delivery stability by 7.2%.
  4. Trust is low: 46% of developers distrust the accuracy of AI output (Stack Overflow, 2025).

Our guide to the AI software development process covers building AI products themselves, which is a different process from using AI to build ordinary software.

Takeaway: Use AI to speed up drafting, coding and test generation, and keep human review and automated tests as the gate to production.

How do you build security into the software development process?

Security belongs in every phase of the software development process, from threat modelling in design to dependency scanning in maintenance. Two free frameworks set the baseline.

  1. NIST Secure Software Development Framework: SP 800-218 version 1.1 (February 2022) groups practices into preparing the organisation, protecting the software, producing well-secured software and responding to vulnerabilities. A version 1.2 draft was released on 17 December 2025.
  2. OWASP SAMM: OWASP SAMM v2 measures maturity across 5 business functions (governance, design, implementation, verification and operations) and 15 security practices.

Takeaway: Ask any vendor which SSDF practices they follow and how they scan code and dependencies before each release.

Why do software projects fail, and how do you avoid it?

Software projects fail mainly through unclear goals, uncontrolled scope and late testing, not through poor coding. On average, large IT projects over $15 million run 45% over budget and 7% over time while delivering 56% less value than predicted (McKinsey and Oxford, 2012), and 31% of complex projects fail to deliver their full intended benefits, according to PMI Pulse of the Profession (2026).

  1. Unclear success metrics: agree measurable outcomes in discovery and review them at every demo.
  2. Scope creep: keep one prioritised backlog and a product owner with authority to say no.
  3. Late testing: automate tests from the first sprint; testing can account for almost a third of system development cost (an arXiv study cited by IBM; IBM, 2025).
  4. No structure: PMI reports that projects using a delivery framework succeed 72% of the time, against 61% without one (PMI, 2026).
  5. Single points of failure: document architecture decisions and keep code in your own repositories from day one.

Takeaway: Most overruns start in discovery and requirements, so spend the first weeks agreeing what success looks like.

Checklist before you hire a software development team

Before you hire a team, confirm these eight points in writing:

  1. A discovery phase with a fixed price and a named deliverable.
  2. A delivery model (Scrum, Kanban or a mix) and the length of each iteration.
  3. Hours per phase and the blended hourly rate behind the estimate.
  4. Who owns the code, repositories, cloud accounts and design files.
  5. The testing approach, including automated tests and security scans.
  6. The release process, monitoring and rollback plan.
  7. The support level and response times after launch.
  8. How AI tools are used and how their output is reviewed.

If you are starting with a first version, an MVP development company can run discovery and build in one engagement. For hiring options, our list of sites to hire web developers compares freelancers, agencies and in-house teams.

Takeaway: Put ownership, testing and support terms in the contract before the first sprint starts.

Plan your software project with Appic Softwares

Appic Softwares runs the full software development process for founders and product teams in the US, UK, Europe and Australia, from discovery to maintenance, with blended rates from $25 per hour. Explore our custom software development services or book a discovery call to get an hours-based estimate for your scope.

Frequently Asked Questions

The software development process is the set of phases a team follows to turn an idea into working, maintained software: discovery, requirements, design, development, testing, deployment and maintenance. It is also called the software development life cycle, or SDLC, and the international standard for it is ISO/IEC/IEEE 12207:2017.

The 7 phases are discovery, requirements, design, development, testing, deployment and maintenance. Each phase ends with a deliverable such as a backlog, a prototype or a release, and in Agile teams the design, development and testing phases repeat inside short sprints instead of running only once.

There is no practical difference. SDLC, short for software development life cycle, and software development process describe the same phases from idea to maintenance. SDLC is the more common term in enterprise, compliance and security writing, while software development process is more common when founders ask how software gets built.

Most startups should use Agile with Scrum, because requirements change once real users see the product. Scrum runs work in sprints of one month or less with a demo at the end of each. Add DevOps practices such as automated testing and releases as soon as the product goes live.

A focused MVP usually takes 2 to 4 months, a medium product 4 to 8 months and a complex system 8 to 18 months or more, according to Keyhole Software (2026). Clutch reports an average of about 13 months across reviewed custom software projects of all sizes.

Published MVP ranges run from $40,000 to $120,000 (Keyhole Software, 2026) or $50,000 to $100,000 (Clockwise Software, 2025), and complex systems reach $1 million or more. Clutch reports an average of $132,480 per reviewed project. Team location changes the price most, so compare quotes by hours per phase and hourly rate.

Discovery and requirements matter most, because mistakes made there spread into every later phase. Large IT projects over $15 million run 45% over budget on average, according to McKinsey and Oxford (2012), and most overruns trace back to unclear goals and changing scope rather than to coding problems.

A typical team has a product owner, a business analyst, a UX designer, a software architect or tech lead, developers, QA engineers and a DevOps engineer. Small MVP teams often combine roles, for example a tech lead who also handles architecture, but every role still needs an owner.

Keep one prioritised backlog and give a product owner the authority to accept, defer or reject changes. In Scrum, new requests go into the backlog and are planned into a future sprint, so the current sprint goal stays stable and the cost of each change is visible before work starts.

Yes. AI and DevOps change how fast each phase runs, not the need for the phases. 90% of respondents to the 2025 DORA report use AI at work, but its earlier report linked more AI adoption to lower delivery stability, so testing and review stages matter more, not less.

Related Articles

Supabase vs Firebase 2026: features, pricing and when to use each
11/26/2026

Supabase vs Firebase (2026): Features, Pricing and When to Use Each

Supabase vs Firebase compared for 2026: SQL vs NoSQL, current pricing with worked examples, security and HIPAA, FlutterFlow support, migration steps and a decision table.

Read More
Cloud Application Development: Process, Architecture and Cost 2026
10/27/2026

Cloud Application Development: Process, Architecture and Cost 2026

A practical 2026 guide to cloud application development for CTOs and founders: cloud-native vs cloud-enabled, serverless vs containers, a 10-step process, sourced build costs and monthly cloud bill estimates from official pricing pages.
Read More
EMR and EHR software development
3/11/2026

EMR vs EHR Software Development: Differences, Features and Cost (2026)

The healthcare industry is under tremendous pressure to improve the quality of its services, improve the efficiency with which it manages patient records, and decrease the time it takes to operate. Paper-based medical records impede the delivery of care to patients by being slow and increasing the chances for error during the delivery of those […]

Read More
Ai Engineer vs. Traditional Software Developer
2/28/2026

AI Engineer vs. Traditional Developer

Introduction If you compare the tech world ten years ago and the upcoming years, there is one thing that you will notice, i.e., exponential growth. Yes, you heard it right, the technological ecosystem has always shown a positive graph and is the reason behind increased job opportunities, country-wide growth, and new inventions happening all across […]

Read More
Role of Software Architect
7/10/2025

Breaking Down the Role of a Software Architect

The role of a software architect is often misunderstood. A number of individuals will respond with different statements, such as “They design the system,” “They draw diagrams,” and “They’re the ones who are slowing us down with reviews.”The truth is far more complex and significant, especially when organizations opt for outsourcing software development to scale […]

Read More
Software development trends
6/23/2025

10 Best Software Development Trends to Look Out for in 2025

The world of software development is rapidly changing. As we mov e into 2025, developers, enterprises, and product leaders are bracing for a new wave of innovation driven by emerging technologies, user demands, and market competition. So, it’s important to understand the software development trends. Whether your position is CTO, tech entrepreneur, or developer, knowing […]

Read More